NGS Logo png

#NGS National Green Specification
A Specification for the 21st Century


replacement website is coming (preview)

GBE Logo def_tr40 png

GBE Green Building Encyclopaedia
One stop shop for environmental construction know-how

Search: PAGES or FILES

01733 238148  0044 1733 238148
07973 281024 •  0044 7973 2810248
BrianSpecMan@aol.com 
Scribd facebook Skype = BrianSpecMan
Twitter = @BrianSpecMan Murphy 
@GBEGreenBuild 
Daily Additions & Updates
Daily Monthly and Quarterly NGS News & Diary

2014 CAPEM logo EU investing png

CAPEMCompassLogo.png

#1773: 22/05/2015: TGR Steering Group Meeting in Bristol

Dropping students work off at LSBU on the way GBE 3D View on the way ready for Vision London presentation
RSS Icon

ABOUT > PAGES > DESIGN > CODECHECKLIST > NEW BUILD > A > 1607

A35 Specific limitations on method/sequence/timing/use of site

A35 Specific limitations on method/sequence/timing/use of site
Checklist: 


Problems:

Misunderstandings:

Solutions:

Value Engineering:
(stuff into projects, not out of them)


Consider:


Avoid:


Minimise:


Substitute:


Resource Efficiency:

Reduce:

Reclaim:

Reuse:

Recycle:

Recycling:

Recover:


Waste Issues:


Waste Category:


Hazardous waste:


Waste Statistics:


End of life options:


Health and Safety Issues:


Wellbeing:


Maintenance issue:


Precautionary principle:


Biodiversity:


Information sources:


© ASWS NGS BrianSpecMan aka Brian Murphy
6th December 2014 

A35 Specific limitations on method/sequence/timing/use of site
Images:


 


If you wish to reproduce images, feel free, but please acknowledge the source.


© NGS BrianSpecMan aka Brian Murphy
6th December 2014

A35 Specific limitations on method/sequence/timing/use of site
See Also:


NGS CPD


NGS JARGON BUSTER

Initials, Abbreviations, Acronyms
 
Names and phrases
 

NGS PROJECTS


NGS SPECIFICATIONS

NGS ROBUST SPECIFICATION

GreenBuildingSpecification


NGS PRODUCTS


NGS LIBRARY


NGS LINKS


© ASWS NGS BrianSpecMan aka Brian Murphy
6th December 2014