NGS Logo png

#NGS National Green Specification
A Specification for the 21st Century


replacement website is coming (preview)

GBE Logo def_tr40 png

GBE Green Building Encyclopaedia
One stop shop for environmental construction know-how

Search: PAGES or FILES

01733 238148  0044 1733 238148
07973 281024 •  0044 7973 2810248
BrianSpecMan@aol.com 
Scribd facebook Skype = BrianSpecMan
Twitter = @BrianSpecMan Murphy 
@GBEGreenBuild 
Daily Additions & Updates
Daily Monthly and Quarterly NGS News & Diary

2014 CAPEM logo EU investing png

CAPEMCompassLogo.png

#1773: 22/05/2015: TGR Steering Group Meeting in Bristol

Dropping students work off at LSBU on the way GBE 3D View on the way ready for Vision London presentation
RSS Icon

J A90 A SMR Statement Of Manufacturers Review

 
  • Number of pages: 3

  • File format: MS Word DOC
  • Scope: Performance Specification Preliminaries Appendix
  • Extract: SPA_SoMR SPEC PRELIMINARIES APPENDIX: STATEMENT OF MANUFACTURER'S REVIEW [To be read with work section A90/107, A91/94 and other work section's clause 94.] STATEM... Submit a signed statement on this pro-forma verifying that the manufacturer(s) of all material(s) or product(s) proposed has(have) been reviewed and approved the proposal as being suitable for the requirements of this project and for the use of their materials or product(s).  PROVIDE the(se) statement(s) at ……
  • Purpose: Used to permit manufacturer or specialist subcontractor to give feedback to designer if the proposal divert from the original intention and guarantees will be breeched
  • Author: BrianSpecMan aka Brian Murphy BSc Dip Arch (Hons+Dist)
  • © ASWS NGS GreenSpec 1985-2012
  • Created: 1980's & 05/01/2008
  • Revision: A04
  • Updated: 23/09/2013
  • Previously published on Scribd: 21/05/2010
  • Scribd reads: 381 @06/01/2013
  • CI/SfB: __
  • CAWS+:  __
  • Uniclass+: __
  • CAWS 2012: __
  • Price and Cost: £0.00
 
 
 
 
 
* 1

Your Reviews / Thoughts

You must be logged in to leave a reply. Login »